If you are paying for energy models and pressure regimes, you cannot afford leaky riser doors. Our airtight riser doors keep air movement under control while still allowing full access to services. Tested to BS EN 1026:2016 and manufactured in the UK.
When you control the air, you control the building. Our airtight riser doors are engineered and tested to limit air leakage at the shaft opening. They support low energy design, pressure controlled corridors and modern smoke control strategies. Each doorset features continuous compression gaskets and precision frame detailing to deliver the airtightness your energy model demands.

Every airtight riser door is manufactured at our UK factory from zintec steel, with continuous compression gaskets around the full perimeter to deliver the airtightness your energy model demands.
Tested to BS EN 1026:2016 with air permeability achieving Class 4 at 600Pa.
Seals vertical riser openings to stop uncontrolled air movement that undermines heating, cooling and ventilation strategies.
Continuous compression gaskets around the full perimeter ensure consistent airtight performance after installation.
Option to combine airtightness with fire ratings up to 120 minutes in a single tested doorset.
Numbers your consultants can rely on. We provide test results, classification data and clear detailing guidance so your mechanical engineer can feed accurate airtight figures into their models.
| Specification | Value |
|---|---|
| Air Tightness Standard | BS EN 1026:2016 |
| Air Permeability | Class 4 at 600Pa |
| Configuration | Single, Double & Multi-Door |
| Frame | Zintec steel |
| Seals | Compression gaskets |
| Lock Options | Budget / Slam / Keyed |
| Lead Time | 3–5 working days |
| Manufacture | UK (Nuneaton) |
Engineered to seal riser shafts and support energy performance, pressure regimes and modern building strategies.
Seal riser shafts on every floor to prevent the stack effect and uncontrolled air movement that wastes energy and undermines comfort.
Stronger alignment with Part L energy performance requirements. Verified airtight data for SAP calculations and energy models.
Critical for hospitals, offices and tall buildings where pressure controlled corridors and zones depend on sealed riser openings.
Combine airtight and fire performance in a single doorset to simplify specification and reduce the number of products on site.
Manufactured and delivered in 3–5 working days from our Nuneaton facility. No import delays or extended lead times.
We design, test and manufacture the complete doorset. One product, one set of test data, one team accountable for performance.
Anywhere air movement is part of the design, not an afterthought.

Low energy and high performance residential schemes requiring sealed riser openings.

Offices and public buildings with mechanical ventilation and pressure controlled zones.

Healthcare settings with pressure controlled zones and critical air management.
Data centres and technical infrastructure spaces requiring controlled environments.
Tall residential towers subject to stack effect and Passivhaus or BREEAM rated developments.
A streamlined process designed for speed and precision, from initial consultation to site delivery.
Discuss your project requirements, including door sizes, fire ratings, acoustic performance, locking and finishes with our technical team.
We provide a detailed specification sheet, CAD drawings, and a competitive quotation. Send us your door schedule for a full project quote.
Doors are CNC-cut, formed, assembled, and finished at our UK factory with full quality traceability on every unit.
Nationwide delivery on palletised, shrink-wrapped consignments. Standard lead time from 3-5 working days.
Everything you need to know about specifying, ordering and installing airtight riser doors.
Independently tested to the highest industry standards for fire safety, quality management, and construction.
ISO 9001:2015, Quality Management
ISO 14001:2015, Environmental
ISO 45001:2018, Health & Safety
UKAS Accredited