Smoke moves faster than fire. The right panel slows it down and keeps people safe. Our smoke rated access panels are tested to BS EN 1634-3:2004 for cold smoke leakage. UK manufactured for performance and speed.
In an emergency, smoke is the real killer. It travels ahead of the fire, filling corridors and escape routes before flames ever reach them. Regulations demand tighter compartmentation and smoke sealing across service risers, corridors, and protected routes. Our panels are designed to maintain smoke integrity while still giving clean, easy access to building services.

Tested to BS EN 1634-3:2004 by accredited laboratories. Precision-built to limit air leakage under ambient conditions.
Tested to BS EN 1634-3:2004 by accredited laboratories. Full test reports supplied with every order.
Tested for cold smoke leakage resistance, providing protection at the early stages of a fire event.
Optional fire-rated and acoustic-rated versions available. Fire ratings from 30 to 120 minutes can be paired with smoke leakage resistance.
Smoke seals and intumescent gaskets included as standard. Multiple face types and lock options available for every application.
Key performance data for smoke rated access panels. All ratings are independently tested.
| Specification | Value |
|---|---|
| Smoke Standard | BS EN 1634-3:2004 |
| Classification | Sa (cold smoke) |
| Application | Walls & Ceilings |
| Face Types | Metal / Plasterboard |
| Combination | Fire + Smoke available |
| Seals | Cold smoke + intumescent |
| Lead Time | 3–5 working days |
| Manufacture | UK (Nuneaton) |
Engineered to maintain compartmentation integrity while providing compliant access to building services.
Maintains compartmentation integrity in escape routes and service zones. Limits smoke travel through service penetrations to protect life safety.
Tested to BS EN 1634-3:2004 for verified resistance. Full compliance documentation supplied for Building Control sign-off.
Available with combined fire and acoustic ratings. A single panel can satisfy fire compartmentation, smoke control, and sound insulation requirements simultaneously.
Plasterboard-faced for a concealed look or metal-faced for durability. Both options deliver clean, professional finishes across any interior environment.
Delivered in 3–5 working days with documentation for sign-off. Bespoke and made-to-measure panels follow the same lead times.
No middlemen, no imports. Full control of quality and delivery from our Nuneaton facility. Smoke test reports and compliance documentation supplied as standard.
Our smoke rated panels are specified wherever smoke control and compartmentation are critical to life safety.

Fire-protected corridors, lobbies and escape routes requiring smoke compartmentation.

Sealed access to M&E services in riser shafts and plant room compartments.

Healthcare, education and public buildings where life safety is paramount.

Hotels, offices and transport hubs requiring smoke control to Building Regulations Part B.

Multi-residential and mixed-use developments with smoke compartmentation requirements.

Secure environments where smoke protection safeguards critical infrastructure.
A streamlined process designed for speed and precision, from initial consultation to site delivery.
Discuss your project requirements, including sizes, ratings, quantities, and finishes with our technical team.
We provide a detailed specification sheet, CAD drawings, and a competitive quotation within 24 hours.
Panels are CNC-cut, formed, assembled, and finished in our UK facility with full quality traceability.
Nationwide delivery on palletised, shrink-wrapped consignments. Standard lead time 3 to 5 working days.
Everything you need to know about specifying and ordering smoke rated access panels.
Independently tested to the highest industry standards for fire safety, quality management, and construction.
ISO 9001:2015, Quality Management
ISO 14001:2015, Environmental
ISO 45001:2018, Health & Safety
UKAS Accredited